Merge pull request #514 from johngmyers/net #382
install-kcl-lsp.yml
on: push
check-windows
17s
check-kcl-lsp-scoop-install
36s
check-kcl-lsp-brew-install-linux
20s
Matrix: check-kcl-lsp-brew-install-macos
Matrix: check-linux
Matrix: check-macos
Annotations
12 errors
|
check-linux (ubuntu-20.04)
This is a scheduled Ubuntu 20.04 retirement. Ubuntu 20.04 LTS runner will be removed on 2025-04-15. For more details, see https://github.com/actions/runner-images/issues/11101
|
|
check-linux (ubuntu-latest)
Process completed with exit code 1.
|
|
check-linux (ubuntu-22.04)
Process completed with exit code 1.
|
|
check-linux (ubuntu-22.04)
The strategy configuration was canceled because "check-linux.ubuntu-latest" failed
|
|
check-macos (macos-14)
Process completed with exit code 1.
|
|
check-macos (macos-latest)
Process completed with exit code 1.
|
|
check-macos (macos-latest)
The strategy configuration was canceled because "check-macos.macos-14" failed
|
|
check-macos (macos-13-xlarge)
Process completed with exit code 1.
|
|
check-macos (macos-13-xlarge)
The strategy configuration was canceled because "check-macos.macos-14" failed
|
|
check-macos (macos-13)
The operation was canceled.
|
|
check-macos (macos-13)
The strategy configuration was canceled because "check-macos.macos-14" failed
|
|
check-windows
Process completed with exit code 1.
|